Skip to content
REDSTICK⌕
SaaSEarthworks and excavationDrainage and utilitiesEarthworks cut and fill takeoff

Smart Construction Dashboard

A cloud app that shows site survey data from drones, rovers, phones and machine guidance over the 3D design, and measures volumes, areas, grades and cross sections to track how much earth has moved and how much is left.

Review no.
RS-R1337
Revision
C
Read at source
11 Nov 2026
Disclosure
None
Method
Read at the maker’s own source. Redstick has not used it.

Assessment

Replaces the cut and fill worked out from sections and a planimeter, or guessed. Earthworks takeoff: bring in the levels, get the volumes, the topsoil strip and the balance. The win is pricing muck shift on numbers. EARTHBRAIN's Smart Construction Dashboard shows survey data over the 3D design to track how much earth has moved and how much is left; it works best fed by the maker's own products. The catch: the volumes are only as good as the levels you feed it.

The catch

Works best fed by the maker's own survey and machine guidance products; rainwater simulation costs extra; price not published

Who forEarthworks and civil contractors and their site and head offices
By whomEARTHBRAIN (株式会社EARTHBRAIN)
Japan
jp.smartconstruction.com ↗
Releasednot stated by the maker
Sold innot stated by the maker
PriceNot publishedNot published; by enquiry to EARTHBRAIN. Rainwater simulation is an extra fee.

What it replaces

Manual volume calculations from survey pegs and separate CAD checks

Who else does it

Compare all 8 for earthworks cut and fill takeoff side by side →

From people who've worked with it

None yet. If you’ve used it on a job, yours could be the first.

Worked with Smart Construction Dashboard? Tell us how it went

Your own experience, in your own words: what you used it for, what it did well, what you’d warn someone about. John reads every report before anything goes on the page, and it goes on under your name, role and company, dated. No star ratings.

Source and revisions

Source: Smart Construction Dashboard, EARTHBRAIN

RevDateChange
C15 Nov 2026Gaps not stated by the maker put on the fixed list (0033).
B12 Nov 2026Assessment drafted from John's earlier assessments, approved by John: now Reviewed.
A11 Nov 2026First read at source (hunt run 2026-11-11x).

Are you the maker?

This listing is free and always will be: no maker pays to be listed or placed. If something here is wrong, tell us at hello@redstick.io and we’ll correct it, with the change dated in the revisions above. To link to this page from your own site, copy the badge below.

Listed on Redstick
<a href="https://redstick.io/reviews/smart-construction-dashboard"><img src="https://redstick.io/badge.svg" alt="Listed on Redstick" width="180" height="44"></a>