Zutec Temporary Works Management
A temporary works system: registers of temporary works with their designs, permits and method statements linked, multi step approval workflows with notifications and dependencies, version control and an audit trail, live programme dashboards of status and compliance, and workload forecasting, set up for BS 5975 processes.
- Review no.
- RS-R1951
- Revision
- C
- Read at source
- 15 Nov 2026
- Disclosure
- None
- Method
- Read at the maker’s own source. Redstick has not used it.
Assessment
Replaces the temporary works register in a spreadsheet and the design check signed off by email. A register of temporary works with designs, permits and approvals linked, to BS 5975. Zutec Temporary Works Management links designs, permits and method statements to each item with step approvals and live dashboards; aimed at infrastructure programmes. The catch: the register holds the process; the temporary works coordinator still owns it.
The catch
Aimed at infrastructure programmes; no price published.
What it replaces
Spreadsheet temporary works registers and paper QA forms.
From people who've worked with it
None yet. If you’ve used it on a job, yours could be the first.
Worked with Zutec Temporary Works Management? Tell us how it went
Source and revisions
Source: Temporary Works Compliance, Zutec
Are you the maker?
This listing is free and always will be: no maker pays to be listed or placed. If something here is wrong, tell us at hello@redstick.io and we’ll correct it, with the change dated in the revisions above. To link to this page from your own site, copy the badge below.
<a href="https://redstick.io/reviews/zutec-temporary-works-management"><img src="https://redstick.io/badge.svg" alt="Listed on Redstick" width="180" height="44"></a>