{"slug":"strikerisk","no":"RS-R2337","name":"StrikeRisk","maker":"Furse (ABB)","kind":"saas","trades":["Electrical"],"standing":"unknown","what":"A lightning protection risk assessment program built on IEC/EN 62305-2. You start from a template for the standard's variant, split the structure into zones, add the cables and remote structures connected to it, compare several cases and print a report of the result.","verdict":"Replaces the cable sizing tables, the protection coordination done by hand and the code book open on the desk. Calculations for one engineering question at a time: cable size, protection, lightning risk, roof wind load. Furse's StrikeRisk works through the IEC/EN 62305-2 lightning risk assessment with zones, connected cables and several cases, which the maker says takes minutes instead of hours by hand; licences by enquiry. The catch: the answer depends on the installation conditions you enter, and it is still the designer who signs it off.","forWho":"Lightning protection designers and installers, electrical and building services engineers, and consultants who must show a risk assessment to IEC/EN 62305-2.","replaces":"Working through the standard's risk formulae by hand or in a home-made spreadsheet.","catch":"Covers the IEC/EN 62305-2 risk assessment only, not the design of the protection system itself, and licences and prices come by enquiry.","price":"Single-user and multi-user licences; price on enquiry to Furse.","video":null,"disclosure":"None","source":{"title":"New StrikeRisk v6.0 risk management software now available","url":"https://new.abb.com/low-voltage/news/news-archive/new-strikerisk-v6-0-risk-management-software"},"checked":"2026-11-17","rev":"B","tier":"reviewed","site":"https://new.abb.com/low-voltage/news/news-archive/new-strikerisk-v6-0-risk-management-software","notStated":["released","maker's country","availability by country","price"],"jobs":[{"slug":"lightning-risk-assessment-for-buildings-and-structures","name":"Lightning risk assessment for buildings and structures"}],"priceShape":"not-published","verdictLine":"Furse's StrikeRisk works through the IEC/EN 62305-2 lightning risk assessment with zones, connected cables and several cases, which the maker says takes minutes instead of hours by hand; licences by enquiry.","family":{"id":"electrical-lightning-and-wind-calculations-008450","name":"Electrical, lightning and wind calculations","head":"Replaces the cable sizing tables, the protection coordination done by hand and the code book open on the desk. Calculations for one engineering question at a time: cable size, protection, lightning risk, roof wind load.","catch":"The catch: the answer depends on the installation conditions you enter, and it is still the designer who signs it off.","tools":8},"page":"https://redstick.io/reviews/strikerisk","history":{"firstRead":"2026-11-17","lastChanged":"2026-11-17","revisions":2,"changes":"https://redstick.io/api/query"}}