SmartPM
Software that analyses uploaded critical path programmes to grade schedule quality, show critical and near critical delays, forecast finish dates and model what-if fixes, with dashboards across projects.
- Review no.
- RS-R236
- Revision
- C
- Read at source
- 8 Nov 2026
- Disclosure
- None
- Method
- Read at the maker’s own source. Redstick has not used it.
Assessment
Not a replacement: what-if analysis on steroids. They check a programme's quality without a planner going through it line by line, and run the scenarios no one has time to build by hand. Aimed at large and complex jobs; probably overkill for smaller projects. Grades programmes made elsewhere, shows critical and near-critical delays, forecasts finish dates and models fixes. Two tiers, no prices published. The catch: the choke point becomes the person who has to act on all those played-out scenarios: analysis paralysis. The answers are only as good as the programme fed in.
The catch
It analyses programmes made elsewhere; it does not build them. Prices are not published, and the Procore page does not say which data fields sync.
What it replaces
Manual programme reviews and delay analysis done by a planner in P6 or Microsoft Project and spreadsheets.
Who else does it
From people who've worked with it
None yet. If you’ve used it on a job, yours could be the first.
Worked with SmartPM? Tell us how it went
Source and revisions
Source: Automated Project Controls (maker)
Are you the maker?
This listing is free and always will be: no maker pays to be listed or placed. If something here is wrong, tell us at hello@redstick.io and we’ll correct it, with the change dated in the revisions above. To link to this page from your own site, copy the badge below.
<a href="https://redstick.io/reviews/smartpm"><img src="https://redstick.io/badge.svg" alt="Listed on Redstick" width="180" height="44"></a>