Skip to content
REDSTICK⌕
AI toolAll tradesMeasuring quantities from drawings (takeoff)

Smart Surveyor

Reads electrical PDF drawings, panel schedules and the tender bill of quantities, counts and measures every symbol and run to scale, reconciles the counts against the bill line by line for an estimator to approve, and exports the takeoff to Excel, GAEB or an ERP.

Review no.
RS-R1839
Revision
C
Read at source
14 Nov 2026
Disclosure
None
Method
Read at the maker’s own source. Redstick has not used it.

Assessment

Replaces the hours an estimator spends counting fixtures and measuring areas on every sheet. AI does the first pass, finding, counting and measuring, and the estimator checks it. The win is time back on the bid: more tenders priced, or the same ones priced properly. Monco's Smart Surveyor counts and measures electrical PDF drawings and reconciles them line by line against the tender bill for the estimator to approve; electrical only, a free pilot on one bid. The catch: none publish an accuracy figure, and every result needs the estimator's check. An AI count you didn't check is a risk you priced.

The catch

Electrical work only for now; no published prices, sold after a demo.

Who forEstimators at electrical contractors pricing tenders from PDF plan sets.
By whomMonco GmbH
Germany
monco.ai ↗
Releasednot stated by the maker
Sold innot stated by the maker
PriceNot publishedNo prices published; sold after a demo, with a free pilot on one bid.

What it replaces

Counting electrical symbols and measuring runs by hand on drawings and checking them against the bill of quantities.

Who else does it

Compare all 37 for measuring quantities from drawings (takeoff) side by side →

From people who've worked with it

None yet. If you’ve used it on a job, yours could be the first.

Worked with Smart Surveyor? Tell us how it went

Your own experience, in your own words: what you used it for, what it did well, what you’d warn someone about. John reads every report before anything goes on the page, and it goes on under your name, role and company, dated. No star ratings.

Source and revisions

Source: Monco.ai, Smart Surveyor for electrical takeoffs

RevDateChange
C15 Nov 2026Gaps not stated by the maker put on the fixed list (0033).
B15 Nov 2026Assessment drafted from John's earlier assessments, approved by John: now Reviewed.
A14 Nov 2026First read at source (hunt run 2026-11-14s).

Are you the maker?

This listing is free and always will be: no maker pays to be listed or placed. If something here is wrong, tell us at hello@redstick.io and we’ll correct it, with the change dated in the revisions above. To link to this page from your own site, copy the badge below.

Listed on Redstick
<a href="https://redstick.io/reviews/smart-surveyor"><img src="https://redstick.io/badge.svg" alt="Listed on Redstick" width="180" height="44"></a>