{"slug":"planera","no":"RS-R186","name":"Planera","maker":"Planera Inc","kind":"saas","trades":["All trades"],"standing":"unknown","what":"Cloud CPM scheduling where the programme is built on a visual board the team can pull-plan on together, with an AI assistant that drafts and updates schedules and checks them against DCMA-14.","verdict":"What they offer is well understood in the industry: logic-linked project sequencing, resource- and cost-loaded (the cost side is less adopted in construction), that breaks a complex project into granular steps. Progress, changes, procurement, design, build and QA can all sit on one shared plan that every stakeholder works towards. Cloud critical path scheduling built on a visual board the team pull-plans on together, with an AI assistant that drafts schedules and checks them against DCMA-14. No price published. The catch: it's only as good as the planner who builds it and the discipline that updates it. A programme that isn't progressed is a picture of intent, not of the job. And stakeholder engagement is key: without it no programme moves beyond a vague intent to something everyone is working both with and towards.","forWho":"General contractors and their schedulers and preconstruction teams, including data centre builders.","replaces":"Oracle P6 and Microsoft Project, and sticky-note pull planning sessions.","catch":"No price is published on the pages read, and no integrations are named, so a Procore link is not confirmed.","price":"No price published on the pages read.","video":null,"disclosure":"None","source":{"title":"Planera construction scheduling software (maker)","url":"https://www.planera.io"},"checked":"2026-11-08","rev":"C","tier":"reviewed","site":"https://www.planera.io","notStated":["availability by country","maker's country","price","released"],"jobs":[{"slug":"planning-and-scheduling-the-programme","name":"Planning and scheduling the programme"}],"priceShape":"not-published","linksRead":"2026-11-12","worksWith":[{"slug":"chatgpt","name":"ChatGPT","kind":"product","link":"integrates","source":"https://www.planera.io/integrations/mcp","checked":"2026-11-12"},{"slug":"claude","name":"Claude","kind":"product","link":"integrates","source":"https://www.planera.io/integrations/mcp","checked":"2026-11-12"},{"slug":"microsoft-project","name":"Microsoft Project","kind":"product","record":"microsoft-project","link":"files","source":"https://www.planera.io/integrations/overview","checked":"2026-11-12"},{"slug":"primavera-p6","name":"Primavera P6","kind":"product","record":"primavera-p6","link":"files","source":"https://www.planera.io/integrations/overview","checked":"2026-11-12"},{"slug":"procore","name":"Procore","kind":"product","record":"procore","link":"integrates","source":"https://www.planera.io/integrations/overview","checked":"2026-11-12"}],"page":"https://redstick.io/reviews/planera","history":{"firstRead":"2026-11-08","lastChanged":"2026-11-15","revisions":3,"changes":"https://redstick.io/api/query"}}