{"slug":"oracle-primavera-cloud","no":"RS-R2753","name":"Oracle Primavera Cloud","maker":"Oracle","kind":"saas","trades":["All trades"],"standing":"unknown","what":"Oracle's cloud planning system for engineering and construction projects. It builds and runs CPM schedules, runs pull planning and weekly work plans for site teams in the Last Planner style, plans labour, plant and materials across projects, and keeps a risk register with scoring and Monte Carlo analysis of schedule and cost. Owners can use it to choose and plan a portfolio of projects. It reads and writes P6 XER files and takes Microsoft Project files, and an AI assistant answers questions on how to use it.","verdict":"What they offer is well understood in the industry: logic-linked project sequencing, resource- and cost-loaded (the cost side is less adopted in construction), that breaks a complex project into granular steps. Progress, changes, procurement, design, build and QA can all sit on one shared plan that every stakeholder works towards. Oracle's cloud planner shares P6's CPM engine but is a separate product, adding Last Planner pull planning, a risk register with Monte Carlo analysis and an AI help assistant, with no price published. The catch: it's only as good as the planner who builds it and the discipline that updates it. A programme that isn't progressed is a picture of intent, not of the job. And stakeholder engagement is key: without it no programme moves beyond a vague intent to something everyone is working both with and towards.","forWho":"Planners, project controls teams, contractors and owners running engineering and construction programmes of any size.","replaces":"Separate tools for the contract programme, lookahead planning, resource plans and spreadsheet risk registers.","catch":"A different product from Primavera P6, so P6 users moving over migrate their projects. The AI assistant has to be switched on by an administrator. No price is published.","price":"No price published; through Oracle.","video":null,"disclosure":"None","source":{"title":"Primavera Cloud - Construction Platform","url":"https://www.oracle.com/construction-engineering/primavera-cloud-project-management/"},"checked":"2026-11-23","rev":"B","tier":"reviewed","site":"https://www.oracle.com/construction-engineering/primavera-cloud-project-management/","notStated":["released","maker's country","availability by country","free plan"],"jobs":[{"slug":"planning-and-scheduling-the-programme","name":"Planning and scheduling the programme"}],"priceShape":"not-published","linksRead":"2026-11-23","worksWith":[{"slug":"open-api","name":"An open API","kind":"format","link":"api","source":"https://www.oracle.com/news/announcement/new-oracle-primavera-cloud-ai-capabilities-help-construction-teams-improve-project-planning-and-risk-2026-11-18/","checked":"2026-11-23"},{"slug":"microsoft-project","name":"Microsoft Project","kind":"product","record":"microsoft-project","link":"files","source":"https://www.oracle.com/construction-engineering/primavera-cloud-project-management/","checked":"2026-11-23"}],"verdictLine":"Oracle's cloud planner shares P6's CPM engine but is a separate product, adding Last Planner pull planning, a risk register with Monte Carlo analysis and an AI help assistant, with no price published.","family":{"id":"critical-path-programme-software-bc1a56","name":"Critical path programme software","head":"What they offer is well understood in the industry: logic-linked project sequencing, resource- and cost-loaded (the cost side is less adopted in construction), that breaks a complex project into granular steps. Progress, changes, procurement, design, build and QA can all sit on one shared plan that every stakeholder works towards.","catch":"The catch: it's only as good as the planner who builds it and the discipline that updates it. A programme that isn't progressed is a picture of intent, not of the job. And stakeholder engagement is key: without it no programme moves beyond a vague intent to something everyone is working both with and towards.","tools":7},"page":"https://redstick.io/reviews/oracle-primavera-cloud","history":{"firstRead":"2026-11-23","lastChanged":"2026-11-23","revisions":2,"changes":"https://redstick.io/api/query"}}