Skip to content
REDSTICK⌕
SaaSAll tradesField management and site apps

Next

A construction project management system for contractors that covers programme planning and resources, procurement of subcontractors and suppliers, HSEQ checklists and inspections, version controlled documents with e-signatures, quotes, variation orders, budgets, forecasts and invoicing, with site apps and a portal for outside users to approve work.

Review no.
RS-R1958
Revision
C
Read at source
15 Nov 2026
Disclosure
None
Method
Read at the maker’s own source. Redstick has not used it.

Assessment

Replaces the drawing set in the site cabin that's two revisions out of date, the snag list on a clipboard, and the site diary written up on Friday. Current drawings, tasks, snags, inspections and diaries on a phone, synced with the office. The win is everyone working from the latest drawing, and a dated record of what happened. A contractor system that runs from programme and procurement through HSEQ checklists to variations and invoicing, linked to Xero; no price published. The catch: they're only as good as the discipline to use them every day; and most of the bigger ones publish no price.

The catch

No prices are published; it is sold by demo.

Who forMain contractors, subcontractors, specialist contractors and site preparation and installation firms.
By whomNext (Aceve)next-tech.com ↗
Releasednot stated by the maker
Sold innot stated by the maker
PriceNot publishedNo prices published; sold by demo.

What it replaces

Separate spreadsheets, paper checklists and document folders for each job, with costs and variations kept apart from the programme.

Who else does it

Compare all 37 for field management and site apps side by side →

From people who've worked with it

None yet. If you’ve used it on a job, yours could be the first.

Worked with Next? Tell us how it went

Your own experience, in your own words: what you used it for, what it did well, what you’d warn someone about. John reads every report before anything goes on the page, and it goes on under your name, role and company, dated. No star ratings.

Source and revisions

Source: Next, powered by Aceve

RevDateChange
C15 Nov 2026Gaps not stated by the maker put on the fixed list (0033).
B15 Nov 2026Assessment drafted from John's earlier assessments, approved by John: now Reviewed.
A15 Nov 2026First read at source (hunt run 2026-11-15u).

Are you the maker?

This listing is free and always will be: no maker pays to be listed or placed. If something here is wrong, tell us at hello@redstick.io and we’ll correct it, with the change dated in the revisions above. To link to this page from your own site, copy the badge below.

Listed on Redstick
<a href="https://redstick.io/reviews/next"><img src="https://redstick.io/badge.svg" alt="Listed on Redstick" width="180" height="44"></a>