Microsoft Project
Gantt and critical path scheduling, as a desktop app or as part of Microsoft's Planner subscriptions.
- Review no.
- RS-R099
- Revision
- C
- Read at source
- 14 Nov 2026
- Disclosure
- None
- Method
- Read at the maker’s own source. Redstick has not used it.
Assessment
What they offer is well understood in the industry: logic-linked project sequencing, resource- and cost-loaded (the cost side is less adopted in construction), that breaks a complex project into granular steps. Progress, changes, procurement, design, build and QA can all sit on one shared plan that every stakeholder works towards. Gantt and critical path, but critical path and baselines come only with Planner and Project Plan 3, at £23.10 per user per month; Plan 1, at £7.70, has finish-to-start links only. The catch: it's only as good as the planner who builds it and the discipline that updates it. A programme that isn't progressed is a picture of intent, not of the job. And stakeholder engagement is key: without it no programme moves beyond a vague intent to something everyone is working both with and towards.
The catch
Critical path, baselines and the Project desktop app come only with Planner and Project Plan 3; the cheaper Plan 1 has finish to start dependencies only.
- United Kingdom: on sale
What it replaces
Spreadsheet programmes and task lists.
Who else does it
From people who've worked with it
None yet. If you’ve used it on a job, yours could be the first.
Worked with Microsoft Project? Tell us how it went
Source and revisions
Source: Microsoft Planner plans and pricing (UK)
Are you the maker?
This listing is free and always will be: no maker pays to be listed or placed. If something here is wrong, tell us at hello@redstick.io and we’ll correct it, with the change dated in the revisions above. To link to this page from your own site, copy the badge below.
<a href="https://redstick.io/reviews/microsoft-project"><img src="https://redstick.io/badge.svg" alt="Listed on Redstick" width="180" height="44"></a>