{"slug":"metaverse-learning-construction-programmes","no":"RS-R1957","name":"Metaverse Learning construction programmes","maker":"Metaverse Learning","kind":"saas","trades":["Scaffolding and access"],"standing":"unknown","what":"A library of licensed immersive training programmes for trade and construction courses (bricklaying, carpentry and joinery, plastering, painting and decorating, tiling, plumbing and gas, retrofit, heat pumps, solar, EV charge points, construction health and safety), run on VR headsets, desktops, tablets or immersive rooms, with a remote assessment tool.","verdict":"Replaces the first attempts at a trade on real materials and a classroom safety talk. Immersive programmes a trainee works through on a headset or tablet before the workshop or the site. A library across the trades, from bricklaying to heat pumps, licensed to colleges and training providers by enquiry. The catch: practice on a screen is not competence on site, and none publishes a price.","forWho":"Colleges, training providers and employers teaching construction trades and site safety.","replaces":"Practice that uses up bricks, plaster and paint in the workshop, and first attempts at site hazards made on a real site.","catch":"Sold as licences to training providers rather than to a firm for one course, with no published prices.","price":"Flexible licensing by enquiry; no prices published.","video":null,"disclosure":"None","source":{"title":"Metaverse Learning For Augmented & Virtual Reality Education, Training","url":"https://metaverselearning.co.uk/"},"checked":"2026-11-15","rev":"C","tier":"reviewed","site":"https://metaverselearning.co.uk/","notStated":["availability by country","price","released"],"makerCountry":"United Kingdom","jobs":[{"slug":"safety-and-skills-training-in-virtual-reality","name":"Safety and skills training in virtual reality"}],"priceShape":"quote","page":"https://redstick.io/reviews/metaverse-learning-construction-programmes","history":{"firstRead":"2026-11-15","lastChanged":"2026-11-15","revisions":3,"changes":"https://redstick.io/api/query"}}