Hexagon Multivista Building Progress Reporting

A progress reporting service that matches 360 degree site photos against the federated 3D model and the programme, marks each model element built or not built, and publishes progress by trade, floor or system against the schedule, with each update checked by the maker's analysts.

Review no.
RS-R1142
Revision
D
Read at source
11 Nov 2026
Disclosure
None
Method
Read at the maker’s own source. Redstick has not used it.

Assessment

Replaces the weekly walk with a clipboard and the argument about percent complete. Site captures matched to the drawings, the model or the programme. Multivista matches 360 photos to the model and programme; needs an NWD model and P6 or Excel, 6 to 8 weeks to set up. The catch: someone has to capture the site every week, and most want a model and a programme set up first.

The catch

It needs a federated NWD model and a P6 or Excel programme, takes the maker's estimate of 6 to 8 weeks to set up, and does not accept drone or SLR photos.

Who forMain contractors and building owners tracking progress on large projects.
By whomHexagon Multivistamultivistaservices.hexagon.com ↗
Releasedto check
Sold innot stated by the maker
PriceBy quoteNot published; by demo or sales request.

What it replaces

Manual progress walks and marked-up drawings for progress against programme.

Who else does it

Compare all 19 for measuring progress against the programme side by side →

From people who've worked with it

None yet. If you’ve used it on a job, yours could be the first.

Worked with Hexagon Multivista Building Progress Reporting? Tell us how it went

Your own experience, in your own words: what you used it for, what it did well, what you’d warn someone about. John reads every report before anything goes on the page, and it goes on under your name, role and company, dated. No star ratings.

Source and revisions

Source: Hexagon Multivista: Building Progress Reporting

RevDateChange
D15 Nov 2026Gaps not stated by the maker put on the fixed list (0033).
C11 Nov 2026Correction: a missing space restored in the assessment; no words changed.
B11 Nov 2026Assessment drafted from John's earlier assessments, approved by John: now Reviewed.
A11 Nov 2026First read at source (hunt run 2026-11-11r).

Are you the maker?

This listing is free and always will be: no maker pays to be listed or placed. If something here is wrong, tell us at hello@redstick.io and we’ll correct it, with the change dated in the revisions above. To link to this page from your own site, copy the badge below.

Listed on Redstick
<a href="https://redstick.io/reviews/hexagon-multivista-building-progress-reporting"><img src="https://redstick.io/badge.svg" alt="Listed on Redstick" width="180" height="44"></a>