{"slug":"gloobe-construction","no":"RS-R2359","name":"GLOOBE Construction","maker":"Fukui Computer Architect Inc. (福井コンピュータアーキテクト株式会社)","kind":"saas","trades":["Concrete","Formwork","Lifting and cranes"],"standing":"unknown","what":"BIM software for planning the build: scaffolding and temporary works, earthworks, structural frame, formwork and shoring, crane and plant positions and ceiling layouts in 3D, tied to a schedule for 4D sequence checks, with point cloud checks and quantities for concrete, steel and scaffolding.","verdict":"Replaces the lift plan worked out from the crane chart and the site layout sketched over the drawings. Planning the crane, the hoist and the site set-up before anything arrives. Fukui Computer Architect's GLOOBE Construction plans the site in 3D to Japanese practice, by quote with a 30 day trial. The catch: each plans only the cranes or kit in its own data, and the plan still needs the lift planner's sign-off.","forWho":"General contractors' site managers and engineers, specialist contractors and design firms moving from 2D CAD to BIM.","replaces":"2D temporary works and site set up drawings, separate bar chart programmes and hand takeoffs of scaffold and concrete.","catch":"It is built to Japanese regulations and practice, and the price depends on modules and licences with no figure published.","price":"By quote depending on usage type, options and licences; 30 day free trial.","video":null,"disclosure":"None","source":{"title":"GLOOBE Construction (Fukui Computer Architect)","url":"https://archi.fukuicompu.co.jp/products/gloobe_c/index.html"},"checked":"2026-11-17","rev":"B","tier":"reviewed","freePlan":false,"site":"https://archi.fukuicompu.co.jp/products/gloobe_c/index.html","notStated":["released","availability by country"],"makerCountry":"Japan","jobs":[{"slug":"planning-the-site-set-up-site-layout-plans-crane-positions-and-f","name":"Planning the site set-up: site layout plans, crane positions and formwork rotations"}],"priceShape":"quote","linksRead":"2026-11-17","worksWith":[{"slug":"bcf","name":"BCF","kind":"format","link":"files","source":"https://archi.fukuicompu.co.jp/products/gloobe_c/index.html","checked":"2026-11-17"},{"slug":"dwg-dxf","name":"DWG and DXF files","kind":"format","link":"files","source":"https://archi.fukuicompu.co.jp/products/gloobe_c/index.html","checked":"2026-11-17"},{"slug":"ifc","name":"IFC","kind":"format","link":"files","source":"https://archi.fukuicompu.co.jp/products/gloobe_c/index.html","checked":"2026-11-17"},{"slug":"jw-cad","name":"Jw_cad","kind":"product","link":"files","source":"https://archi.fukuicompu.co.jp/products/gloobe_c/index.html","checked":"2026-11-17"},{"slug":"landxml","name":"LandXML","kind":"format","link":"files","source":"https://archi.fukuicompu.co.jp/products/gloobe_c/index.html","checked":"2026-11-17"},{"slug":"revit","name":"Revit","kind":"product","record":"autodesk-revit","link":"files","source":"https://archi.fukuicompu.co.jp/products/gloobe_c/index.html","checked":"2026-11-17"},{"slug":"sima","name":"SIMA","kind":"product","link":"files","source":"https://archi.fukuicompu.co.jp/products/gloobe_c/index.html","checked":"2026-11-17"},{"slug":"st-bridge","name":"ST-Bridge","kind":"product","link":"files","source":"https://archi.fukuicompu.co.jp/products/gloobe_c/index.html","checked":"2026-11-17"},{"slug":"sxf","name":"SXF","kind":"product","link":"files","source":"https://archi.fukuicompu.co.jp/products/gloobe_c/index.html","checked":"2026-11-17"}],"verdictLine":"Fukui Computer Architect's GLOOBE Construction plans the site in 3D to Japanese practice, by quote with a 30 day trial.","family":{"id":"planning-the-lift-and-the-site-set-up-dc9a22","name":"Planning the lift and the site set-up","head":"Replaces the lift plan worked out from the crane chart and the site layout sketched over the drawings. Planning the crane, the hoist and the site set-up before anything arrives.","catch":"The catch: each plans only the cranes or kit in its own data, and the plan still needs the lift planner's sign-off.","tools":8},"page":"https://redstick.io/reviews/gloobe-construction","history":{"firstRead":"2026-11-17","lastChanged":"2026-11-17","revisions":2,"changes":"https://redstick.io/api/query"}}