{"slug":"fu3e","no":"RS-R2746","name":"fu3e","maker":"fu3e","kind":"saas","trades":["All trades"],"standing":"unknown","what":"Cloud software for running stage gates on large capital programmes. Schedule, risk, milestones, changes and approvals sit in one system; each gate needs its evidence and sign-offs before a project moves on, and gateway packs for the board are produced from the checklists and linked evidence.","verdict":"Replaces the delivery manual in a shared folder that nobody opens. The firm's way of running a project held as stages, templates and stage gates, with compliance tracked across the portfolio. fu3e, sold on the Siemens Xcelerator marketplace for infrastructure, energy and data centre programmes, builds gateway packs from checklists and linked evidence, with approvals on SLA countdowns, priced by quote. The catch: the playbook has to be written and kept up by the firm itself before it pays back.","forWho":"Programme offices, programme leaders and assurance teams on infrastructure, energy and data centre programmes.","replaces":"Gate reviews run on spreadsheets, documents and email chains, with board packs assembled by hand.","catch":"It is priced by quote, and the listing does not name which scheduling or risk tools it connects to.","price":"By quote, through the Siemens Xcelerator listing.","video":null,"disclosure":"None","source":{"title":"Project Controls Gated Assurance Software, fu3e (Siemens)","url":"https://www.siemens.com/en-gb/products/project-controls-gated-assurance-software-fu3e/"},"checked":"2026-11-23","rev":"B","tier":"reviewed","site":"https://www.siemens.com/en-gb/products/project-controls-gated-assurance-software-fu3e/","notStated":["released","maker's country","availability by country"],"jobs":[{"slug":"project-delivery-playbooks-stage-gates-and-assurance","name":"Project delivery playbooks, stage gates and assurance"}],"priceShape":"quote","linksRead":"2026-11-23","worksWith":[],"verdictLine":"fu3e, sold on the Siemens Xcelerator marketplace for infrastructure, energy and data centre programmes, builds gateway packs from checklists and linked evidence, with approvals on SLA countdowns, priced by quote.","family":{"id":"project-delivery-playbooks-b35a33","name":"Project delivery playbooks","head":"Replaces the delivery manual in a shared folder that nobody opens. The firm's way of running a project held as stages, templates and stage gates, with compliance tracked across the portfolio.","catch":"The catch: the playbook has to be written and kept up by the firm itself before it pays back.","tools":2},"page":"https://redstick.io/reviews/fu3e","history":{"firstRead":"2026-11-23","lastChanged":"2026-11-23","revisions":2,"changes":"https://redstick.io/api/query"}}