Skip to content
REDSTICK⌕
SaaSAll tradesPreconstruction cost planning and design decision tracking

Design2Cost

BIM cost management that runs on Allplan: quantities taken from the model feed bills of quantities and the cost plan, and design changes and variants show their cost effect.

Review no.
RS-R1600
Revision
C
Read at source
13 Nov 2026
Disclosure
None
Method
Read at the maker’s own source. Redstick has not used it.

Assessment

Replaces the bill of quantities typed up in Word, the price comparison in Excel and the invoices checked against it by hand. The German client and design side's software: cost plan to DIN 276, bills of quantities from standard texts, the tender, the award, and the invoices checked against it. NEVARIS Design2Cost takes Allplan model quantities into the bill and cost plan and shows what a design change costs; needs Allplan. The catch: built around German procurement and standards (VOB, DIN 276, GAEB), and the text and price libraries are often a paid package on top.

The catch

Needs Allplan as its CAD platform; no price published.

Who forArchitects, engineers, developers, general contractors and project managers costing designs from an Allplan model.
By whomNEVARIS Bausoftware
Germany
nevaris.com ↗
Releasednot stated by the maker
Sold in
Europe
  • Austria: on sale
  • Germany: on sale
PriceNot publishedNo price published.

What it replaces

Manual takeoff from drawings and re-keying quantities into a separate cost plan after each design change.

Who else does it

Compare all 12 for preconstruction cost planning and design decision tracking side by side →

From people who've worked with it

None yet. If you’ve used it on a job, yours could be the first.

Worked with Design2Cost? Tell us how it went

Your own experience, in your own words: what you used it for, what it did well, what you’d warn someone about. John reads every report before anything goes on the page, and it goes on under your name, role and company, dated. No star ratings.

Source and revisions

Source: Design2Cost

RevDateChange
C15 Nov 2026Gaps not stated by the maker put on the fixed list (0033).
B15 Nov 2026Assessment drafted from John's earlier assessments, approved by John: now Reviewed.
A13 Nov 2026First read at source (hunt run 2026-11-13y).

Are you the maker?

This listing is free and always will be: no maker pays to be listed or placed. If something here is wrong, tell us at hello@redstick.io and we’ll correct it, with the change dated in the revisions above. To link to this page from your own site, copy the badge below.

Listed on Redstick
<a href="https://redstick.io/reviews/design2cost"><img src="https://redstick.io/badge.svg" alt="Listed on Redstick" width="180" height="44"></a>