ConstructivIQ
A procurement log linked to the programme: each material or equipment item gets a required-on-job date from the schedule, its submittal status comes in from Procore or Autodesk, and subcontractors and suppliers report lead times and delivery dates, with warnings when an item is at risk.
- Review no.
- RS-R197
- Revision
- C
- Read at source
- 8 Nov 2026
- Disclosure
- None
- Method
- Read at the maker’s own source. Redstick has not used it.
Assessment
Replaces the procurement schedule kept in a spreadsheet, chasing suppliers by phone for lead times, and matching delivery tickets to invoices by hand. The win is knowing an item is going to be late while there's still time to do something about it. ConstructivIQ ties each item to its required-on-job date from the programme, pulls submittal status from Procore or Autodesk, and warns when an item is at risk; it needs P6 or Microsoft Project and takes a few weeks to set up. The catch: none publish a price, and they're only as good as the dates the suppliers and the programme give them.
The catch
No price is published, and it depends on a schedule in P6 or Microsoft Project and on submittals in Procore or Autodesk; full set-up takes a few weeks.
What it replaces
Procurement logs kept in spreadsheets and chased by email against the programme.
Who else does it
From people who've worked with it
None yet. If you’ve used it on a job, yours could be the first.
Worked with ConstructivIQ? Tell us how it went
Source and revisions
Source: ConstructivIQ product (maker)
Are you the maker?
This listing is free and always will be: no maker pays to be listed or placed. If something here is wrong, tell us at hello@redstick.io and we’ll correct it, with the change dated in the revisions above. To link to this page from your own site, copy the badge below.
<a href="https://redstick.io/reviews/constructiviq"><img src="https://redstick.io/badge.svg" alt="Listed on Redstick" width="180" height="44"></a>