{"slug":"asta-powerproject","no":"RS-R056","name":"Asta Powerproject","maker":"Eleco (Elecosoft UK Ltd)","kind":"saas","trades":["All trades"],"standing":"uk","what":"Builds and tracks the construction programme: tasks, links, critical path, resources and costs, with progress captured on a phone app.","verdict":"What they offer is well understood in the industry: logic-linked project sequencing, resource- and cost-loaded (the cost side is less adopted in construction), that breaks a complex project into granular steps. Progress, changes, procurement, design, build and QA can all sit on one shared plan that every stakeholder works towards. A standard for construction programmes, with progress captured on a phone app. The full program is Windows desktop and the site app is licensed separately; a 14-day trial, no prices published. The catch: it's only as good as the planner who builds it and the discipline that updates it. A programme that isn't progressed is a picture of intent, not of the job. And stakeholder engagement is key: without it no programme moves beyond a vague intent to something everyone is working both with and towards.","forWho":"Planners and project managers at main contractors and larger subcontractors.","replaces":"Microsoft Project or spreadsheet programmes for construction work.","catch":"Windows desktop for the full program; the site app is licensed separately; no price published.","price":"Single-user, concurrent and SaaS licences; free 14-day trial; no prices shown.","video":null,"disclosure":"None","source":{"title":"Asta Powerproject - Eleco","url":"https://eleco.com/products/asta/asta-powerproject/"},"checked":"2026-11-10","rev":"E","tier":"reviewed","site":"https://eleco.com/products/asta/asta-powerproject/","jobs":[{"slug":"planning-and-scheduling-the-programme","name":"Planning and scheduling the programme"}],"available":[{"code":"CA","country":"Canada","status":"distributor","checked":"2026-11-10","source":"https://elecosoft.com/us/modal-content/powerproject-reseller/"},{"code":"NL","country":"Netherlands","status":"on-sale","checked":"2026-11-10","source":"https://eleco.com/nl/?p=29279"},{"code":"GB","country":"United Kingdom","status":"on-sale","checked":"2026-11-10","source":"https://elecosoft.com/us/support/contact/"},{"code":"US","country":"United States","status":"on-sale","checked":"2026-11-10","source":"https://elecosoft.com/us/support/contact/"}],"priceShape":"quote","features":[{"slug":"used-on-phone","name":"Used on the phone, on site","family":"Capturing the day","kind":"yes-no","unit":null,"status":"yes","value":null,"makersClaim":true,"source":"https://eleco.com/products/asta/asta-powerproject/","checked":"2026-11-07"}],"linksRead":"2026-11-12","worksWith":[],"page":"https://redstick.io/reviews/asta-powerproject","history":{"firstRead":"2026-11-07","lastChanged":"2026-11-10","revisions":5,"changes":"https://redstick.io/api/query"}}